4. Concrete Pouring:
Once the site has been inspected the process of concrete pouring can begin. This is done using a concrete mixer and the concrete is then poured directly into the forms. While the concrete is being poured it’s leveled off and bull floated. Surface joints are then cut to prevent random cracks from appearing in the concrete.
5. Concrete Finishing:
Next the finishing process can take place, which consists of brooming and floating the newly poured concrete surface. If other concrete treatments are to be applied, they are done during this step of the process. Once the finishing process is completed, the concrete is left to dry. Within 24 hours the concrete driveway should be ready for some light walking, but we suggest that it be left to cure for a minimum of 7 days before heavy objects like cars are to be driven on it.